Stans Buildtech
Our ProjectsAbout UsLeadershipCareersContact Us
95 WestOngoing

95 West

Malad West, MumbaiOngoing
View floor plans
Scroll
Project
95 WestDevelopment · Residential
Location
Malad West, MumbaiMumbai, Maharashtra
Status
OngoingPossession Upon Request
MahaRERA
On requestRegistration details
Scan for
RERA listing
Overview

95 West, at a glance.

95 West by Stans Buildtech Group offers contemporary 1 and 2 BHK residences with efficient layouts and considered finishes.

Configuration
1 & 2 BHK
Structure
Ground + 21 floors
Construction area
3,25,000 sq ft
Possession
Upon Request
Project type
Development · Residential
21
Floors · Ground + 21
Location

Malad West, Mumbai, without the traffic.

Nearby places, with approximate distances from the site.

Connectivity

Marve Road250 m
Malad Railway Station3.8 km
Mith Chowki Metro Station4 km

Everyday

Billabong International School1.5 km
Infinity Mall4 km
Marve Beach6.5 km
Floor Plans

Every layout, to scale.

1 BHK
1 BHK
2 BHK
2 BHK
Typical Floor Plan
Typical Floor Plan
Amenity Deck Plan
Amenity Deck Plan
Podium Plan
Podium Plan
Project Layouts

Configurations available.

The layouts and carpet areas offered in this project. Updated by the sales team from the backend — always live.

ConfigurationCarpet area
1BHKnull sq.ft.
2BHKnull sq.ft.
Carpet area as defined under RERA.
Amenities

The floor everyone actually uses.

The shared amenities planned for residents of 95 West.

01Representative imageGymnasium
02Representative imageSwimming pool
03Representative imageIndoor games
04Representative image24×7 security
Brochure

The full project book.

Everything about 95 West in one PDF.

  • 01All unit plans at print scale
  • 02Specification sheet, room by room
  • 03Amenity floor layout
  • 04Payment schedule and booking terms
Name and number first · also unlocks the floor plans
Brochure
FAQs

Asked at every site visit.

95 West is in Malvani, Malad West, Mumbai.

1 & 2 BHK apartments.

95 West is an ongoing project.

Ground + 21 floors, with about 3,25,000 sq ft of construction.

Enquire

Talk to the 95 West team.

The form knows which project you're on — the sales team gets it tagged, so nobody asks you twice.

Prefer to just call?

Call or message the sales team, or visit our head office.

Head Office

B/518 Samartha Aishwarya, Opp. Highland Park,
Lokhandwala, Andheri (W), Mumbai — 400 053

Office Hours

Mon – Fri · 9:00 am – 6:00 pm
Sat · 10:00 am – 4:00 pm

Chat on WhatsApp